Skip to main content

Posts

Showing posts with the label RURAL ICT

BO Computer Device information - under RICT Solutions -Department unveiled the project

BO Computer Device information - under RICT Solutions -Department unveiled the project                                            Main Computing Device (MCD) Peripherals / accessories to MCD Important abbreviations

RURAL ICT SOLUTION TO GRAMIN DAK SEVAKS - A ONE STOP SHOP FOR ALL FINANCIAL NEEDS TO RURAL PEOPLE

Launch of the Rural ICT project of the Department by handing over the solar powered, biometric hand-held devices with connectivity along with the application software to Gramin Dak Sewaks from three pilot Circles viz Bihar, UP and Rajasthan on 28th Dec 2015 Benefits of Hand-held device to the rural citizen  Electronic transactions- Booking and delivery of Speed Post, registered mail, money orders, sale of stamps and postal stationery will be done through these devices and paper receipt shall be generated  instantaneously thereby eliminating chances of overcharging and other problems associated with manual transactions. Savings Bank deposits & withdrawals, PLI/RPLI premium deposits and loan/claim payments will also be done electronically on these devices.  Immediate uploading of transaction data and financial reconciliation- Using mobile connectivity, data pertaining to all transactions done on the hand-held devices shall be uploaded onto the central serv...
PRE-IMPLEMENTATION ACTIVITIES TOWARDS RURAL ICT IN BRANCH POST OFFICES I.          The BO should have table to place the Handheld Device and for charging the device.   II.          The electrical power connection is required to charge the  Solar UPS  wherever power is available. In the locations where electrical power is not available, the UPS will be charged from  Solar Panel .    III.          The locations where electrical power connection is there, it should have proper earthing and with one or two plug points along with on/off switch.     IV.          The above site preparation is to be done before the roll out starts for the particular Division.      V.          The data on BO such as the  name of the BPM...